Full Report for Listed Buildings


Summary Description of a Listed Buildings


Reference Number
628
Building Number
 
Grade
II*  
Status
Designated  
Date of Designation
04/01/1966  
Date of Amendment
29/07/1998  
Name of Property
Cefn (Newbridge) Viaduct (partly in Cefn Community)  
Address
 

Location


Unitary Authority
Wrexham  
Community
Cefn  
Town
Wrexham  
Locality
Newbridge  
Easting
328536  
Northing
341173  
Street Side
 
Location
The viaduct carries the railway across the wide valley of the River Dee between Newbridge and Cefn-bychan.  

Description


Broad Class
Transport  
Period
 

History
The viaduct was built to the design of Henry Robinson of Llantysilio, chief engineer to the Shrewsbury to Chester Railway, in 1846, Thomas Brassey being the general contractor, and completed in August 1848. The cost was £72,346. The Shrewsbury Chester line was initiated by 'King' Robinson, who had received his training under George Stephenson, and who recognised the need, not met by the canals, to transport materials to Wrexham and Chester. The line became part of the Great Western Railway system in 1854.  

Exterior
Built of coursed squared rock-faced sandstone, the upper arched stage of brick faced with stone. It is 460m (1,508ft) long, comprising 19 arches of 18.2m (60ft) span, rising 46m (147ft) above the river. The main piers are tapered upwards to the springing line, above which the arch voussoirs are recessed behind the face. Above, the low parapet is carried on a corbel table.  

Interior
 

Reason for designation
Included at grade II* as a highly impressive and architecturally elegant example of mid C19 railway engineering.  